Commissioning Day. The new powder handling line is installed. The FAT (Factory Acceptance Test) was signed off six months ago. The vendor says: "Everything runs perfectly." The project manager smiles. The GM cuts the ribbon.
You push "Start."
The rotary valve chatters. The vertical mixer discharge takes 40 minutes instead of the promised 8. The vibration sifter blinds within 20 minutes. Powder is everywhere. The ribbon blender replacement—the one that was supposed to "solve all mixing problems"—is actually making segregation worse.
Day One. And your brand-new $2 million line is already a disaster.
At Doebritz-Tec, we get called to "rescue" new lines that never made it past commissioning. And the story is always the same: The equipment works. The system doesn't.
![]()
Your supplier tested the equipment with rice, plastic pellets, or nothing at all. The motor turned. The valve rotated. The FAT passed.
But your actual product is nothing like rice. It's fine. It's cohesive. It's hygroscopic. It has a completely different angle of repose, wall friction coefficient, and bulk density than the test material.
What happens: The cone mill that "passed FAT at 2,000 kg/h" with plastic pellets can only handle 400 kg/h of your actual powder before it overheats and blinds.
The result: Your nameplate capacity is a fantasy. Your production schedule is impossible. Your customer deliveries are late.
Each piece of equipment was tested separately. The rotary valve works. The vertical mixer works. The sack tipping station works. But when you connect them, the system fights itself.
Common integration failures:
The result: Every piece of equipment is "within spec." But the line as a whole doesn't work.
The procurement team bought equipment based on a datasheet written two years ago. Since then, the product formulation changed. The particle size distribution shifted. The moisture content increased. The production rate doubled.
But the equipment was already ordered. To the original (now-obsolete) spec.
The result: You're running today's product through yesterday's equipment. It doesn't fit. It never will.
FAT (Factory Acceptance Test) is the industry standard. And it's almost useless for powder handling equipment.
Here's why:
A passed FAT tells you one thing: The equipment is not broken when it leaves the factory. That's it. It tells you nothing about whether it will work in your plant, with your powder, on your schedule.
At Doebritz-Tec, we do things differently. Before we build your equipment, we do three things most suppliers skip:
We measure your powder's properties: bulk density, particle size distribution, angle of repose, wall friction angle, cohesive strength, moisture content, electrostatic propensity. We don't assume "it's like flour." We measure.
We run your actual powder through our test cone mills, vertical mixers, and rotary valves at our test facility. We measure actual throughput, actual mixing time, actual discharge rate. We give you data, not promises.
We don't just sell you a machine. We review your entire line. We check that the discharge rate of the valve matches the feed rate of the mixer. That the sifter screen area matches your actual particle size distribution. That the dust collector capacity matches your actual dust generation rate.
If something doesn't match, we tell you before you buy. Not after commissioning.
FAT is factory. SAT (Site Acceptance Test) is on-site. But most SATs are just FAT repeated at your plant—run it empty, check the rotation direction, sign the paper.
A real SAT for powder equipment should include:
At Doebritz-Tec, our SAT includes all of the above. If the equipment doesn't perform to spec with your actual powder in your actual plant, we fix it before we leave. That's not a warranty. That's a promise.
A lithium battery materials company built a new cathode powder line. Every piece of equipment passed FAT at the supplier's factory. The line was installed. Commissioning began.
Day 1 problems:
The supplier said: "The equipment is fine. Your product must be the problem."
The Doebritz Rescue:
The Result: Line reached nameplate capacity within 3 weeks. Zero sifter blinding after screen change. Mixer discharge time: 9 minutes.
Before you sign the next equipment purchase order, ask your supplier:
A passed FAT is not a guarantee. A datasheet is not a promise. A ribbon-cutting photo is not production.
Your new line should work on Day One. Not Day Thirty. Not after three "optimization" rounds. Day One.
At Doebritz-Tec, we don't sell equipment that passes tests in our factory but fails in yours. We sell equipment that works with your powder, in your plant, on your schedule. Because a machine that runs on a bench but not on your floor is not a machine. It's a paperweight.
Don't commission a disaster. Commission a line that works.